“An IED detonated while being recovered by the 391st Engineers route clearance package. No injuries to personnel only minor damage to mine clearing vehicle. A second IED was found approximately 300 meters from the first IED. The second IED consisted of (2) 82mm mortars and a car battery. The second IED was destroyed by the Engineers.” — Source: 3/3 Command Chronology for the Period 01 January to 30 June 2005